Total Tonnage – 300 MT
Duration – 3 Months
Tekla License Involved – 2
This structure needs to make or design so accurately as the high temp. gas may not leak from that structure. All the components are leak-proof and sealed. Almost zero error design & construction are needed to build a successful Linz-Donawitz (LD) converter Structure – also known as the Basic Oxygen Furnace (BOF).